● 2,000 TPA
● 20,000 TPA
● Meet All Production Capacity Needs
● Installation to Operation Within 12 Hours
● Lower O&M Costs by 90%
Electricity Consumption
0.68MWh/t NH3
Energy Consumption
2.45GJ/t NH3
Number of People Operating
2
Load Adjustment Speed
≥2%/min
Electricity Consumption
0.55Mh/t NH3
Energy Consumption
1.98GJ/t NH3
Cooling Water
~2,400L/T
Area Required
1,680m2